Pre-Shipment and Loading Inspector Electrical Equipment Ventilators
Junior / Apprendista

Inspecker's logo

Inspecker

Via Reggio Calabria, Cascine Vica, Rivoli, Torino, Piemonte, 10098, Italia

Di persona

Libero professionista

Logistics and Inspection

Descrizione della Posizione Lavorativa

HIB-42 pre-shipment and loading inspection will be carried out for electrical equipment and ventilators at Via Reggio Calabria 13, Rivoli, Italy on 03 December 2024.

The project description is provided only to the extent authorized by the company representative. After you submit your offer, you will be able to request the full details again from your dashboard.

  • Job Budget: RFQ (Request for Quotation). The target price was not specified.
  • Fee requirement: please submit your total hourly rate when responding to this job.
  • Start Date: 03 December 2024
  • Due Date: 03 December 2024
  • Budget: Unspecified
  • Status: In Progress
  • Location note: primary inspection site indicated as Via Reggio Calabria 13, Rivoli; some source metadata also references San Lorenzo RC, Italy.

Requisiti

One-day on-site inspection on 03/12/2024 at Via Reggio Calabria 13, Rivoli (Italy). Submit total hourly rate with your offer. Project details are limited in the public description and can be requested from your dashboard after offer submission. Ability to travel to the site required.

Competenze richieste

  • Competenze professionali
  • Pre-shipment inspection Loading inspection Electrical equipment inspection Ventilator equipment knowledge Technical reporting Safety and compliance checks
  • Competenze trasversali
  • Attention to detail Clear communication Punctuality Reliability Report writing